TxDOT On/Off System Bridge Replacements, Lufkin, TX

Water Resources | Drainage

Role: Subconsultant

AZ&B provided H&H modeling services for four bridge replacement projects in Lufkin District. One bridge was on-system, the other three were off-system county roads, and ll four crossings were in FEMA Zone ‘A’ floodplains. AZ&B used NRCS TR-20 methodology for peak flow rates. We created existing condition HEC-RAS models as baseline comparisons. Each new bridge was designed using HEC-RAS to ensure no rise in 100-year WSEL outside of the ROW. AZ&B analyzed potential bridge scour at each crossing with HEC-18 methods. For each bridge, we prepared a hydraulic report and hydraulic data PS&E sheets.

Construction Estimate

$2 million

Services

    • H&H Modeling
    • TR-20 (NRCS) Modeling
    • HEC-RAS Modeling
    • FEMA Zone ‘A’ Crossings
    • Local Floodplain
    • Administrator Coordination
    • Bridge Scour Analysis
    • PS&E Preparation
    • Ditch Design
    • Culvert Design