Rowlett Creek CIPP, Plano, TX

Water Resources | Wastewater

Role: Prime

This project included research and data collection, preliminary design, final design, bid phase, and construction-related professional engineering services for the rehabilitation of the existing 21-inch to 42-inch diameter reinforced concrete pipe interceptor. Approximately 5.23 miles of sewer interceptor were rehabilitated using the “Cured in Place” method. Some sections of the sewer interceptor were replaced in place due to sags on the line. Manholes were replaced to meet the TCEQ and City of Plano Manual for the Design of Water and Sanitary Sewer Lines requirements. Coordinated with Los Rios Golf Course, Chase Oaks Golf Course, Oak Point Park & Natural Preserve, Bob Woodruff Park, Arbor Hill Nature Preserve Park, TXDOT, DART, COE, City of Allen, and City of Plano departments.

Construction Estimate

$7.8 million

Services

    • Surveying
    • Civil Design
    • Environmental