Fasken Oil & Gas, Midland, TX

Energy | Natural Gas & Oil

Role: Prime

The Fasken Oil and Gas project begins in Midland along US 191 and extends westward into Midland County. AZ&B’s focus was to design a project that minimized interference with the busiest intersection (Loop 250 and US 191) in West Texas. Our design proposed a utility schematic that was safe and effective for the highway commuters, project owners, and business owners along the alignment. The project consisted of designing four FlexSteel pipelines, two natural gas, one oil, and one brackish water along the westbound frontage road of US 191 for approximately 4.25 miles within the TxDOT ROW.

Construction Estimate

$7.5 million

Services

    • Pipeline Design